Perform periodic inspections to ensure that the HP POD 40c G2 continues to perform according to design parameters. During periodic inspections, pay special attention to electrical connections and wiring.
For more specific maintenance information, see the HP Performance Optimized Datacenter 40c G2 Maintenance and Service Guide.
Sample HP POD 40c G2 maintenance schedule
For detailed maintenance information and schedules, consult with HP services.
The following table is a sample maintenance schedule for an HP POD 40c G2. For more detailed maintenance information, see the HP Performance Optimized Datacenter 40c G2 Maintenance and Service Guide.
Component to be inspected | Frequency |
|
|
Electrical connections and | Every 30 days |
|
|
Electrical connections and | Every 180 days |
Condensation and drainage system | Every 30 days |
Condensation and drainage system | Every 90 days |
Busway interconnects (tightened) | Every 180 days |
EPO system | Every 180 days |
For more information about the | |
and so on) | components, see the Operation |
| and Maintenance manual for |
| the HP Performance Optimized |
| Datacenter 40c G2. |
|
|
Maintenance 74