5.Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

Note A

Make a reference mark here for anti-skid tape.

1" (2.54 cm)

Note B

Keep flange pushed down

to concrete and leveled.

1" (2.54 cm)

SIDE VIEW

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.

6.After concrete has cured, remove bottom pole section from ground sleeve (4). Place anti-skid tape (6) around the bottom area of bottom pole (see note A).

6

5

Note A

Place top edge of anti-skid tape on mark made in step 5.

4

Note B

Tape prevents the pole from rotating during play.

11

02/04

P/N 21145507