Huffy Sports Basketball Systems manual Side View, Note A, Note B

Models: Sports Basketball Systems

1 28
Download 28 pages 57.72 Kb
Page 11
Image 11
Note A

5.Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

Note A

Make a reference mark here for anti-skid tape.

1" (2.54 cm)

Note B

Note BManual background Keep flange pushed down

to concrete and leveled.

1" (2.54 cm)

SIDE VIEW

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.

6.After concrete has cured, remove bottom pole section from ground sleeve (4). Place anti-skid tape (6) around the bottom area of bottom pole (see note A).

6 Manual background

Manual backgroundManual background5

Note A

Place top edge of anti-skid tape on mark made in step 5.

Manual backgroundManual backgroundManual background4

Note B

Tape prevents the pole from rotating during play.

11

02/04

P/N 21145507

Page 11
Image 11
Huffy Sports Basketball Systems manual Side View, Note A, Note B