5.Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.
Note A
Make a reference mark here for
1" (2.54 cm)
Note B
Keep flange pushed down
to concrete and leveled.
1" (2.54 cm)
SIDE VIEW
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.
6.After concrete has cured, remove bottom pole section from ground sleeve (4). Place
6
5
Note A
Place top edge of
4
Note B
Tape prevents the pole from rotating during play.
11 | 02/04 | P/N 21145507 |