EonStor A16E-G2130-4 Installation and Hardware Reference Manual

STP cables should be applied. Infortrend provides certified cables as an optional accessory. One 3-meter STP Ethernet cable is available as an accessory option. Please see Chapter 4 for sample topologies and configuration options.

5.Memory module: If you wish to change the pre-installed memory module, a separately purchased module can be installed. (See Section 5.3)

6.BBU module: If you wish to use a BBU module, the module can be purchased separately. For installation instructions, please see Section 2.7.

7.Rack installation: The enclosure chassis can be installed into a rack cabinet using separately purchased mounting rails, or Infortrend’s IFT- 9273CSlide32 or IFT-9273Cslide36slide rails. (See Section 2.10)

2.3Safety Precautions2.3.1Precautions and Instructions

1.Disconnect the power cords if the need should arise for cleaning the chassis. Do not use liquid or sprayed detergent for cleaning. Use a lightly moistened clothe for cleaning.

2.Be sure the correct power range (100-120 or 220-240VAC) is supplied by your rack cabinet or power outlet. It is highly recommended to connect two different power supplies to separate power sources; e.g., one to a power outlet, and the other to a UPS system.

3.Thermal notice: All drive trays (even if they do not contain a hard drive) must be installed into the enclosure. Leaving a drive bay or module slot open will severely affect the airflow efficiency within the enclosure, and will consequently lead to system overheating. Keep a faulty module in place until you have a replacement unit and you are ready to replace it.

4.Rack-mounting: The subsystem is intended to be rack-mounted. Following concerns should be heeded when mounting the enclosure into a rack cabinet:

a.An enclosure without disk drives can weigh over 30 kilograms. Two (2) people are required to install or relocate the subsystem. Drives should be removed from the enclosure before moving the subsystem.

2-2

Safety Precautions