SECTION 1 — TABLE OF CONTENTS
SECTION 1 — TABLE OF CONTENTS | 2 |
SECTION 2 — INTRODUCTION | 4 |
SECTION 3 — SAFETY | 4 |
INSTALLATION | 4 |
OPERATION | 4 |
MAINTENANCE AND REPAIR | 4 |
SECTION 4 — INSTALLATION | 6 |
Unit Location | 6 |
Power Supply | 7 |
Pressure Sensor Location | 7 |
SUPPLY (WET) Side Pressure Control | 7 |
DEMAND (DRY) Side Pressure Control | 7 |
Pressure Sensor Connection | 8 |
8 | |
Input Functions | 9 |
Ready Input | 9 |
Ready Input, Alternative Connection Method | 9 |
Run Input | 10 |
Warning Input (optional) | 10 |
Output Functions | 11 |
Pressure Switch Regulation | 11 |
Digital Regulation Control Terminal C01 | 11 |
Service Maintenance Switch | 12 |
Auxiliary Input (Option) | 12 |
Auxiliary Output (Option) | 13 |
RS485 Communications | 13 |
SECTION 5 — ASSISTANCE | 13 |
SECTION 6 — X4I Overview and Interconnect Drawings 13 | |
X4I Overview | 11 |
X4I Interconnect To Ingersoll Rand Unigy & |
|
Nirvana 15 - 30KW | 15 |
Unigy 1 1of2 | 11 |
Unigy 1 2of2 | 11 |
Unigy 2/3 1of2 | 11 |
Unigy 2/3 2of2 | 11 |
Nirvana 15 - 30KW | 20 |
Nirvana 15 - 30KW | 21 |
X4I Interconnect To Ingersoll Rand Intellisys Redeye |
|
Controlled Compressors | 22 |
SSR Redeye 1of3 | 23 |
SSR Redeye FV 2of3 | 24 |
SSR Redeye SD 3of3 | 25 |
X4I Interconnect To Ingersoll Rand Intellisys SE |
|
Controlled Compressors | 26 |
SE UP 1of2 | 27 |
SE UP 2of2 | 28 |
SE ESA 1of2 | 29 |
SE ESA 2of2 | 30 |
SE DSA 1of2 | 31 |
SE DSA 2of2 | 32 |
X4I Interconnect To Ingersoll Rand Intellisys SG |
|
Controlled Compressors | 33 |
SG SSR 1of2 | 34 |
SG SSR 2of2 | 35 |
SG Sierra 1of2 | 36 |
SG Sierra 2of2 | 37 |
X4I Interconnect To Ingersoll Rand Pressure Switch |
|
Controlled Compressors | 38 |
SSR UP5 | 39 |
SSR UP5 | 40 |
SSR UP5 | 41 |
SSR UP5 | 42 |
SSR UP6 | 43 |
SSR UP6 | 44 |
SSR UP6 | 45 |
SSR UP6 | 46 |
SSR UP6 | 47 |
SSR UP6 | 48 |
SSR UP6 | 49 |
SSR UP6 | 50 |
UP6 | 51 |
UP6 | 52 |
UP6 | 53 |
UP6 | 54 |
UP6 | 55 |
UP6 | 56 |
UP6 | 57 |
UP6 | 58 |
www.air.irco.com | 2 | X4I System Automation |
|