TABLE OF CONTENTS

GENERAL

PAGE

Specifications

1

INSTALLATION

 

Unpacking

2

Plumbing Connections

2

Electrical Connections

2

Gas Connection

3

OPERATING INSTRUCTIONS

 

Preparation

4

Power Up

4

Initial Fill

4

Preparing the Dishes

4

Daily Machine Preparation

4

Washing a Rack of Ware

4

Shut Down and Cleaning

4

OVERVIEW OF OPERATION

5

THERMOSTAT ADJUSTMENT PROCEDURE

7

AUTO-CALIBRATION PROCEDURE

8

ELECTRONIC CONTROL BOARD (ECB)

9

TESTING THERMISTORS

10

CONTROL BOARD LED LIGHT INDICATIONS

11

TROUBLESHOOTING

12

DIMENSIONS

19

TABLE DIMENSIONS

20

PHOTOGRAPHS

 

Main Assembly

21

Control Box Assembly-Front View

22

Control Box Assembly-Top View

23

Hood Assembly

24

Cantilever Arm Assembly

25

Tub Assembly

26

Back of Tub, & Drain Assembly

27

Lower Assembly (Right Side)

28

Incoming Plumbing Assembly

29

Gas Pack Assembly

31

Upper Wash, & Rinse Arm Assembly

32

Lower Wash, & Rinse Arm Assembly

33

Steam Coil Assembly

34

Rinse Tank Assembly

36

Electronic Control Drawer Components

37

METRIC CONVERSION

38

SCHEMATICS

 

208/240 Volt Schematic

39

i

Page 2
Image 2
Jackson Tempstar TGP technical manual Table of Contents