Jenn-Air 30, 36 manual Cabinet Preparation, A, B

Models: 30 36

1 56
Download 56 pages 5.09 Kb
Page 5
Image 5
STEP 2: CABINET PREPARATION

STEP 2: CABINET PREPARATION

1.The range is a free-standing unit. If the unit is to be placed adjacent to cabinets, the clearances shown in Figures 2A/B/C are required. The same clearances apply to island installations.

2.The range can be placed in various positions with respect to the cabinet front, with the front either flush or projecting, depending on the countertop depth. See

Figure 3A/B and Table 2 (side view of range) for dimensions.

3.The gas and electrical supply should be within the zones shown in Figures 2 and 4.

4.The maximum depth of over head cabinets installed on either side of the hood is 13￿.

(PRG3010)

FIGURE 2A

(PRG3610)

FIGURE 2B

(PRG4810)

FIGURE 2C

5

Page 5
Image 5
Jenn-Air 30, 36 manual Cabinet Preparation, A, B