Johnson Controls TM9V MP UIM-B-0509, Furnace Assembly - Mc Series Coils Only, Mounting Plate

Models: TM9V MP

1 38
Download 38 pages 36.38 Kb
Page 6
Image 6
FURNACE ASSEMBLY - MC SERIES COILS ONLY

438335-UIM-B-0509

FURNACE ASSEMBLY - MC SERIES COILS ONLY

MC coils are supplied ready to be installed in a horizontal position. A horizontal pan is factory installed. MC coils should be installed in all hor- izontal applications with the horizontal drain pan side down.

Mounting Plate

Furnace

FIGURE 4: Horizontal Right Application

For horizontal left hand applications no conversion is required to an MC

C

D(Min)

Field

Fabricated FurnaceMounting PlateFURNACE ASSEMBLY - PC SERIES COILSCRITICAL COIL PROJECTIONCOIL / FURNACE ASSEMBLY - HC SERIES COILS

Ductwork

Upflow Manual background

Coil

Upflow

Furnace

Flexible Manual background Duct Collar

Do not drill or Screw this flange

coil when used with a downflow/horizontal furnace. A mounting plate, supplied with every coil should always be installed on the side desig- nated as top side. See Figures 4 & 5.

Mounting Plate

Furnace

FIGURE 5: Horizontal Left Application

FURNACE ASSEMBLY - PC SERIES COILS

These upflow coils are designed for installation on top of upflow fur- naces only.

If the coil is used with a furnace of a different size, use a 45° transition to allow proper air distribution through the coil.

1.Position the coil casing over the furnace opening as shown in Figures 6.

2.Place the ductwork over the coil casing flange and secure.

3.Check for air leakage between the furnace and coil casing and seal appropriately.

Do not drill any holes or drive any screws into the front duct flange on the coil in order to prevent damaging coil tubing. See Figures 6

Primary

Secondary

Alternate

Drain

Drain Location

Drain

 

 

FIGURE 6: PC Series Upflow Coil Installation

Table 2: Coil Projection Dimensions - PC Series Coils

COIL SIZE

DIMENSION “C” INCH

PC18

3-1/2

PC24

4-1/2

PC30, PC32, PC35

4-1/2

PC42, PC43, PC36, PC37

5-1/2

PC48

6-1/2

PC60

9

NOTE: Dimension “C” should be at least 2/3 of dimension “D”. See Figures 6

CRITICAL COIL PROJECTION

The coil assembly must be located in the duct such that a minimum dis- tance is maintained between the top of the coil and the top of the duct. Refer to Table 6.

COIL / FURNACE ASSEMBLY - HC SERIES COILS

These coils are supplied ready to be installed in a right hand position or a left hand position. When used in conjunction with a horizontal furnace (blow through) application, the coil should be oriented with the opening of the “A” coil closest to the furnace. See Figure 6.

NOTE: Each coil is shipped with an external tie plate that should be used to secure the coil to the furnace. It should be installed on the back side of the coil using the dimpled pilot holes. See Figure 6.

Use tie plate

supplied with coil

Gas Furnace

FIGURE 7: Horizontal Left or Right application (Right Shown)

6

Johnson Controls Unitary Products

Page 6
Image 6
Johnson Controls TM9V MP UIM-B-0509, Furnace Assembly - Mc Series Coils Only, Mounting Plate, Critical Coil Projection