Jotul GF 400 DV Co-linearVent Installation, These installation requirements must be followed

Models: GF 400 DV

1 32
Download 32 pages 8.44 Kb
Page 12
Image 12
Co-linear Vent Installation

Co-linear Vent Installation

The GF 400 DV Sebago may be vented through a ma- sonry or Class A prefabricated chimney using a Co-linear Flexible Vent system approved for use with a solid-fuel burning fireplace. When installed in the manner de- scribed below, this system can improve the performance of the appliance in cold climate situations, as well as simplify the vent installation. See fig. 13.

These installation requirements must be followed:

1.Use the guidelines for Co-linear Vent Termination appropriate for your gas type on pages 10 - 11.

Exhaust Gas

Max. Co-linear Height - 35 ft. (10.66 m)

Min. Co-linear Height - 10 ft. (3.05 m)

High Wind Cap

Intake Air

1.Prior to the installation the chimney flue must be thoroughly cleaned and inspected by a qualified chimney service person.

2.In a masonry chimney, a fireclay liner must be present the entire length of the chimney.

3.Prefabricated chimneys must be UL 103 or ULC S-629 listed and have a minimum INSIDE diameter of 6 inches, (150 mm).

4.No appliance can be installed into a chimney flue serving any other appliance of any kind.

5.THE AIR INTAKE FLEX PIPE MUST EXTEND 6 FEET BEYOND THE DAMPER AREA OF THE FIREPLACE.

6.If the intake flex duct does not extend the full length of the chimney and connect to both the unit and the termination cap, A METAL BLOCK OFF PLATE MUST BE CONSTRUCTED AND INSTALLED ABOVE THE UNIT PRIOR TO THE END OF THE INTAKE FLEX AND MUST COMPLETELY SEAL THE CHIMNEY FLUE FROM THE ROOM.

Consult with the local code authority having juris- diction before proceeding with this type of installation.

Refer to the vent manufacturer’s instructions for specific installation requirements.

WARNING: FAILURE TO POSITION THE PARTS AND STOVE IN ACCORDANCE WITH THESE DIAGRAMS OR FAILURE TO USE ONLY PARTS SPECIFICALLY APPROVED FOR USE WITH THIS APPLIANCE MAY RESULT IN PROP- ERTY DAMAGE OR PERSONAL INJURY. BE SURE TO MAINTAIN THE PROPER CLEARANCES TO COMBUSTIBLES AS DEFINED IN THIS MANUAL AND IN THE INSTRUC- TIONS PROVIDED WITH EACH VENT COMPONENT.

 

The Air

 

Intake Flex

 

pipe must

 

extend

 

beyond the

The chimney

damper.

 

must be sealed

Dual 3”Flex

off from the

Liners

room by a steel

 

plate at the

 

damper area.

 

 

Max. offset

 

24”

 

(609 mm)

Figure 13. Co-linear Adaptor installed through a masonry chimney. Components shown may differ somewhat from manufacturer to manufacturer.

29” to top of Co-linear

25 1/2” Adapter. to center

of flue collar

Figure 14. Simpson Dura-Vent #923GCL Co-linear Adaptor is shown - other manufacturer’s components may differ. Subtract 2 1/4” for Short Legs.

12

Page 12
Image 12
Jotul GF 400 DV manual Co-linearVent Installation, These installation requirements must be followed