FRONT
LEG
BACK
LEG
Fully Closed
Fully Open
Figure 6. Adjusting the Air Inlet Restrictor plate - View is from the right side of the stove.
Vertical Vent Termination
The Jøtul GF 400 DV Sebago can be vertically vented through a ceiling or to a roof termination with the following guidelines:
The termination should fall within the shaded areas of the grids depicted in the Vent Window diagrams on the pages
Maximum Vertical run should not exceed 35 ft. (10.66 m).
Minimum Vertical run must be at least 8 ft. (2.43 m).
Max. Colinear Horizontal run is 2 ft. (61 cm).
Vent Terminus Clearance: In no case shall any dis- charge opening on the cap be less than 18 in. (610 mm) horizontally from the roof surface.
Steep roofs, nearby trees, and predominantly windy conditions can contribute to poor draft and/or promote
Use Wall Straps to support an offset pipe run at three feet intervals to avoid excessive stress on the offsets.
Elbows: Four 45°, or two 90° elbows may be used. Do not include the 45° elbow attached to the stove. Whenever possible use 45° elbows instead of 90° elbows as they are less restrictive to exhaust gas and intake air flow.
A firestop is required at every floor. The opening should be framed to 10" X 10" inside dimension.
Any venting that is exposed above the first floor, regardless of attic space or living space, must be enclosed. Always maintain the required 1" clearance from all sides of the vertical vent system.
Push the | A | Default |
Pivot Pin into | Factory | |
the slot | B | |
| C | Setting is |
| D | “D” |
AB |
C |
D |
Front of |
Stove |
Figure 7. Adjusting the Exhaust Restrictor plate - Top Plate removed. Viewed from front of stove.
Horizontal Overhang | all | ||
|
| ||
18”. | 18”. | W | |
Vertical | |||
min. | min. | ||
| |||
|
| Lowest Discharge | |
Termination |
| Opening | |
|
| ||
Cap | 18” min. |
| |
|
|
Figure 8. Vertical vent termination height above roof.
9