Kohler K-684, K-683 manual Roughing-In Before You Begin, 1/2 1.3 cm Min Clamp Arm Clearance, Cutout

Models: K-685 K-686 K-683 K-684

1 36
Download 36 pages 32.62 Kb
Page 4
Image 4
1/2" (1.3 cm) Min Clamp Arm Clearance

1/2" (1.3 cm) Min Clamp Arm Clearance

3-5/8" (9.2 cm)

 

 

Clamp Arm

 

3-5/8" (9.2 cm) –

 

4-5/8" (11.7 cm)

4-1/2" (11.4 cm)

Wall Cavity

Depth

8-1/2"

(21.6 cm)

7-5/8"

(19.4 cm)

3/16" (5 mm) Min – Clamp ArmCutout1/4" (6 mm) Min 2" (5.1 cm) Max Depth

 

 

 

 

 

 

 

 

 

 

Cutout

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-11/16"

 

 

 

 

 

 

 

 

 

1/4" (6 mm) Min

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interface Lip

(19.5 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3-11/16" (9.4 cm)

Cutout Detail

8-Pin Interface Cable

30' (9.14 m)

4-Pin Auxiliary Interface Cable

30' (9.14 m)

Roughing-In

Before You Begin

Observe all local plumbing, building, and electrical codes.

Read these instructions and determine all required components along with their installation locations before beginning this installation.

A licensed electrician should install a 120 V GFCI electrical outlet, within the stud framing, in close proximity to the electronic valve. The interface(s) is/are powered through the connection(s) with the valve.

Install the valve prior to installing the interface(s).

Kohler Co. reserves the right to make revisions in the design of faucets without notice, as specified in the Price Book.

1043184-2-B

4

Kohler Co.

Page 4
Image 4
Kohler K-684, K-683 Roughing-In Before You Begin, 1/2 1.3 cm Min Clamp Arm Clearance, Cutout, 1/4 6 mm Min, Interface Lip