Installing the
Front View of
Rear View of
8.Install the bezel by positioning and installing the bezel stud receptacles on the back of the bezel over the ball studs (39U rack) or latch brackets (40U rack) on the rail ends.
9.Push the bezel onto the ball studs or latch brackets until it snaps and locks into place. The illustration below shows an installed, unpainted
10.Plug one of the supplied power cords into each of the switch’s two power receptacles.
11.When installing the
20
EMC Departmental Switches