Switch Mounting Kit
Component | Use |
#10 washers | 1 washer and 1 ball stud per rail to hold |
ball studs | bezel (2) |
| 39U bezel only |
Latch brackets and keyplate spacers | 2 each to secure 1U bezel for 16M |
| switch in 40U cabinets |
Left and right latch brackets | 1 left and 1 right to secure 2U bezel for |
| 32M switch in 40U cabinet |
1U or 2U, | 1 per switch |
Two | 2 per switch |
Two | (use the ones appropriate for your PDU) |
Tools Required for Installation
You will need to have the following tools available to complete the installation of the rails and switch(es).
◆# 1 Phillips head screwdriver
◆
◆5/16-in. nut driver
4
EMC Departmental Switches