Installing the
1.Assemble the rails.
The rails assembly consists of an adjustable rail, a C channel, and two washers and kep nuts. See the figure below.
C channel
Adjustable rail
a.Insert the threaded posts on the C channel into the slot on the adjustable rail.
b.Secure the adjustable rail to the C channel with two #10 flat washers and M5 kep nuts. Leave the nuts finger tight.
Attach washers\nuts to threaded posts
2.Determine where in the rack/cabinet you are going to locate the switch.
The left/right orientation of the rails is determined by the location of the word “top” on the C channel. The rail is oriented correctly when this word “top” is up and toward the rack/cabinet front. See the next figure.
EMC Departmental Switches
7