Installing the
"Top" up and to the rack front
3.Adjust the length of the rail to fit between the channels in the rack/cabinet.
NOTE: The rail flanges go to the inside of the channels.
4.Once the rails are adjusted to the correct length, tighten the kep nuts on the rail assembly.
NOTE: If the side skins are removed on the rack/cabinet, you can tighten the kep nuts after you install the rails.
5.Align the holes of the front rail flange to the inside of the front channel. The top and bottom screw holes are used for the screws; the center screw hole is used for the ball stud or latch bracket.
Flange to the inside
of the channel (rack front)
6. Secure the rail to a
8