Table of Contents
Section 1 Assembly and Setup
Land Pride
Tractor Requirements
The RCR2584 Rotary Cutter is designed for use with trac- tors that are equipped with a (540 RPM 1
The tractor must also provide for
NOTE: In order to maintain steering control, ballast may need to be added to your tractor. To determine whether or not to add the ballast, refer to your trac- tor’s operator manual.
Lift-Type Cutter
3-Point Hitch Assembly
NOTE: Do not tighten hardware until assembly is complete. Refer to “Torque Values Chart for Common Bolt Sizes” on page 27.
Refer to Figure 1-1:
1.Assemble hitch braces (#2) to the rear strap lugs (welded to cutter deck) using 5/8" x 1 1/2" bolts (#7), and 5/8" lock nuts (#8).
2.Rotate hitch straps (#1) and hitch braces (#2) up to a vertical position. Install bushing (#10) and pivoting hitch (#3) to the inside of hitch straps (#1), with hitch braces (#2) on the outside. Install 1” x 6” long bolt (#4) and lock nut (#5).
3-Point Quick Hitch Assembly
Assemble as shown in Figure
Driveline Installation
1.Remove wing nut holding gearbox shield and flip up and out of the way.
2.Attach the slip clutch end of the driveline (#6) to the gearbox input shaft securely. Make certain that the slip clutch is fully onto the input shaft splines. Tighten the two lock nuts on back side of slip clutch alternately until they have reached the proper torque.
3.Secure chain (#9) on driveline to hitch brace (#2) to re- strict outer shield from rotating.
4.Swing gearbox shield back into place and
14399 | |
| Figure |
Figure | 16440 |
|
8 | RCR2584 Rotary Cutter | 7/14/08 |