Lantronix LPS1-T, MPS100, LPS1-2 manual Installation, MPS/LPS Product Description

Models: LPS1-T LPS1-2 MPS100

1 74
Download 74 pages 19.89 Kb
Page 11
Image 11

2: Installation

This chapter describes the various MPS models and shows how to install them into a basic network situation.

2.1 MPS/LPS Product Description

The front panel of the MPS100 has a Test button, 3 LEDs, a power connector, and an RJ45 connector for 100BASE-T. The rear panel has a Centronics connector. The front

“back”

Centronics Connector

LINK AC 100T

TEST

5VDC

“front”

panel of the LPS has a Test button, 2 LED’s, a power connector, and a 10BASE-T network connector for the LPS1-T or a 10BASE-2 BNC connector for the LPS1-2. The rear panel also has a Centronics connector.

The LINK LED is solid green when there is a valid Ethernet network connection. The ACT (Activity) LED flashes green or red when the MPS is in use. The 100 (100 MBit) LED (MPS100 only) is solid green when a 100BASE-T network is connected.

The Test button serves two functions. When pressed briefly, it prints a test page. When pressed for five seconds while plugging in the power cable, it returns the MPS to its factory default configuration.

2-1

Page 11
Image 11
Lantronix LPS1-T, MPS100, LPS1-2 manual Installation, MPS/LPS Product Description