Start-Up & Performance Check List
UNIT SET UP
2
Furnace:
Model Number_______________
Serial Number_________________
Line Voltage
4
SUPPLY |
AIR |
1GAS SUPPLY
Natural Gas | LP Propane Gas |
| Piping Connections Tight |
| Leak Tested |
2 | Supply Line Pressure “W.C.________ |
| |
| 1 |
| Gas Supply Pressure |
| 1 |
3
Flter
RETURN AIR
3DUCT SYS
TEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
2INTAKE / EXHAUST
PIPE
All Joints Primed and Glued
Terminations Installed Properly
Horizontal Pipes Sloped (if applicable)
![Furnace:](/images/new-backgrounds/35442/3544295xi2.webp)
Condensate Trap Primed / Line Sloped
Pipes Sup
ported
Heat Cable Installed and Operable (if applicable)
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
4VOLTAGE CHECK Supply Voltage _____
Electrical Connections Tight
Page 48