Operating Instructions

Figure 20 One system in bypass to Continuous Tie operation (Option 1)

FROM:

One System in Bypass Mode

 

 

System 1

 

 

 

 

 

System 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1

 

M1

 

SS1

 

SS2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tie Open

Tie

Load 1 Load 2

TO:

Continuous Tied Systems

TO:

Restart Bypassed System

 

 

System 1

 

 

 

 

 

System 2

 

Partial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1

 

M1

 

SS1

 

SS2

 

M2

 

 

 

or full

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

capacity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tie Open

Tie

Load 1 Load 2

System 1

System 2

M1

M1

SS1

SS2

M2

2

Tie Closed

Tie

Load 1 Load 2

LEGEND: Mx = Module

SSx = Static Bypass Switch

Restart the bypassed system, then use the procedures in Tying the UPS Systems - Continuous Parallel Operations (in Section 4.2.11) or see Figure 21.

Figure 21 One system in bypass to Continuous Tie operation (Option 2)

M1

FROM:

One System in Bypass Mode

System 1

 

 

 

 

 

System 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1

 

SS1

 

SS2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1

TO:

Combined Loads Operation

System 1

 

 

 

 

 

System 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1

 

SS1

 

SS2

 

M2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M2

M1

Tie Open

 

 

 

Tie

 

 

Load 1

Load 2

 

 

TO:

 

Continuous Tied Systems

System 1

 

 

System 2

M1

SS1

SS2

M2

Momentary Tie

 

Tie Closed

for transfer of

 

Load 2 to

Tie

 

 

System 1

Load 1

Load 2

Partial or full capacity

Tie Closed

Tie

Load 1 Load 2

LEGEND: Mx = Module

SSx = Static Bypass Switch

Combined loads on one system—See4.2.4 - Isolating a UPS System for Maintenance - Combined Loads Operation; restart bypass system. Then use Continuous Tie procedures—Tying the UPS Systems - Continuous Parallel Operations in Section 4.2.11.

Restart one system, then refer to Figure 20. Or restart both systems, then refer to Figure 15.

37

Page 41
Image 41
Liebert Series 610 user manual One system in bypass to Continuous Tie operation Option