3.Clean the water reservoir and screens after ap- proximately 60 to 70 units of work. To remove the water reservoir:
A.Disconnect the power supply.
B.Remove the rear cover from the machine.
C.Pull the drain hose out of the lid.
D.Slide the tank out.
Servicing the Stones
DANGER
EXTREME CARE MUST BE TAKEN TO AVOID CRACKING THE STONE. A CHIPPED OR BRO- KEN STONE COULD CAUSE SERIOUS INJURY TO THE OPERATOR.
Dressing the Stone
For true roundness, dressing with an optional diamond dressing tool works well. To remove glazing, open the pores and reshape the cupped stone. An optional granite dressing stick may be used.
Belt Tension
The tension of the toothed drive belt may be adjusted by loosening the hex nut and sliding the tensioner up or down in the slotted hole. After desired tension is achieved, retighten the hex nut. Figure
25