![Log Installation](/images/new-backgrounds/54468/5446841x1.webp)
Finalizing the Installation (for qualified installers only) 2 1
Log Installation
!Make sure the gas control valve is “OFF” and the heater is cool prior to conducting service.
!Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this appliance may result in property damage or personal injury.
Place the rear log so it rests against the ledge on the back wall of the firebox.
Push on the outer edges to
insure it sits up straight.
Note how it does not cover
any of the burner holes.
Align the edge of the
log with the edge of the burner.
NOTE: Rotate the front log so there is a 1/8” to 1/4” gap along the front of the log
Place the twig so the pin on the rear log inserts into the hole on the twig. NOTE: you may need to tilt the rear log forward to insert the pin.
1/8” - 1/4”
Installing the Rock Wool:
The rock wool comes in one clump. Tear off “dime” sized clumps and flatten. Then pull on the wool to create
Front View of Logs
Place the embers over the front and
side edges of the
burner in a random
pattern (do not place
them over the burner
holes).
Travis Industries | 1 0 0 - 0 1 1 4 2 | 4 0 5 0 1 1 4 |