Operation and Maintenance
5-21
9124-A2-LB20-00 March 2000
PVC Connection StatusPVC connection statuses are selected from the Status menu.
Main Menu →Status →PVC Connection Status
Only PVC connections with Source DLCIs configured to be Active are shown.
PVC Connection Status Screen Example
main/status/connections 9124-II
Device Name: Node A 05/26/1999 23:32
Page 1 of 2
PVC CONNECTION STATUS
Source Primary Destination
Link DLCI EDLCI Link DLCI EDLCI Status
Port-1 201 Net1-FR1 300 0 Active
Port-1 202 Net1-FR1 1001 0 Active
Port-1 100 Net1-FR1 1001 2 Active
Port-1 204 Net1-FR1 1001 2 Active
Mgmt PVC Mgm205 Net1-FR1 1001 2 Active
Port-1 206 Net1-FR1 1001 Active
Port-1 207 Net1-FR1 1001 Active
Port-1 208 Net1-FR1 500 Active
Port-1 209 Net1-FR1 502 2 Inactive
Port-1 210 Net1-FR1 504 2 Inactive
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
ESC for previous menu MainMenu Exit
Refresh PgUp PgDn
If the No PVC Connections message appears instead of a list of PVC
connections, no PVC connections have been configured yet.
Table 5-10. PVC Connection Status (1 of 2)
Field Status What It Indicates
Link Identifies the cross-connection of
DLCIs configured for the unit.
Net1-FR1 HSource/destination is frame relay
link 1 on Network 1
Port-1 HUser data port – Port-1
MgmtPVC Name HVirtual circuit is a management
link that terminates in the unit,
where Name is the link name
DLCI 16 to 1007 For standard DLCIs.
Identifies an individual link/
connection embedded within a
DLCI.