![Operational Checks](/images/new-backgrounds/38713/3871375x1.webp)
Ice Machine Operation | Section 3 |
|
|
Operational Checks
GENERAL
Manitowoc ice machines are
To ensure proper operation, always follow the Operational Checks:
•when starting the ice machine for the first time
•after a prolonged out of service period
•after cleaning and sanitizing
NOTE: Routine adjustments and maintenance procedures are not covered by the warranty.
WATER LEVEL
The water level sensor is set to maintain the proper water level above the water pump housing. The water level is not adjustable.
If the water level is incorrect, check the water level probe for damage (probe bent, etc.). Repair or replace the probe as necessary.
ICE THICKNESS CHECK
The ice thickness probe is
NOTE: Make sure the water curtain is in place when performing this check. It prevents water from splashing out of the water trough.
1.Inspect the bridge connecting the cubes. It should be about 1/8" (3.2 mm) thick.
2.If adjustment is necessary, turn the ice thickness probe adjustment screw clockwise to increase bridge thickness, counterclockwise to decrease bridge thickness.
NOTE: Turning the adjustment 1/3 of a turn will change the ice thickness about 1/16" (1.5 mm).
ADJUSTING SCREW
1/8” ICE BRIDGE THICKNESS
SV1208
Figure 3-9. Ice Thickness Check
3.Make sure the ice thickness probe wire and the bracket do not restrict movement of the probe.
SV1616
Figure 3-8. Water Level Probe
Part Number 000001114 |