Manitowoc Ice S manual Air-Cooled Baffle, Leveling Leg and Foot, Air Baffle

Models: S

1 56
Download 56 pages 31.88 Kb
Page 20
Image 20

Installation Instructions

Section 2

 

 

Removing Drain Plug and Leveling the Ice Storage Bin

1.Remove threaded plug from drain fitting.

2.Screw the leveling legs onto the bottom of the bin.

3.Screw the foot of each leg in as far as possible.

!Caution

The legs must be screwed in tightly to prevent them from bending.

4.Move the bin into its final position.

5.Level the bin to assure that the bin door closes and seals properly. Use a level on top of the bin. Turn the base of each foot as necessary to level the bin.

6.Inspect bin gasket prior to ice machine installation. (Manitowoc bins come with a closed cell foam gasket installed along the top surface of the bin.)

7.Remove all panels from ice machine before lifting. Remove both front panels, top cover, left and right side panels.

8.Install ice machine on bin.

THREAD LEVELING

LEG INTO BASE OF

CABINET

SV1606

Leveling Leg and Foot

Air-Cooled Baffle

SELF-CONTAINED AIR-COOLED ONLY

The air-cooled baffle prevents condenser air from recirculating. To install:

1.Remove the back panel screws next to the condenser.

2.Align the mounting holes in the air baffle with the screw holes and reinstall the screws.

AIR

BAFFLE

SCREWS

SV1607

Air Baffle

2-8

Part Number 80-1620-3

Page 20
Image 20
Manitowoc Ice S manual Air-Cooled Baffle, Leveling Leg and Foot, Air Baffle