Maytag RFS Testing Procedures, Tab Tab, Function, Test Set-Up, Meter, Probe Placement, Results

Models: RFS RCS RCS10DA

1 36
Download 36 pages 32.79 Kb
Page 23
Image 23
TAB 1

Testing Procedures

!WARNING

To avoid risk of electrical shock, personal injury or death; disconnect power to oven and discharge capacitor before servicing, unless testing requires power.

RLY 3

2 1

TAB 1

TAB 2

 

9 8

5 4 3

1

 

 

CN1

 

 

 

 

 

 

 

 

 

 

Function

Test Set-Up /

Meter

 

Probe Placement

Results

 

Condition

Setting

 

 

 

Power to current

All Conditions

Volts

 

Tab 1 to CN1 Pin 3 (Neutral)

120 VAC

transformer

 

 

 

 

 

Power from current

All Conditions

Volts

 

Tab 2 to CN1 Pin 3 (Neutral)

120 VAC

transformer

 

 

 

 

 

 

 

 

 

 

 

Power from Oven TCO

All Conditions

Volts

 

CN1 – Pin 1 (Black wire to Neutral)

120 VAC

Power to Oven Light

Standby

Volts

 

CN1 – Pin 4 to Pin 1

120 VAC

 

Ready

Volts

 

CN1 – Pin 4 to Pin 1

0 VAC

 

Cook

Volts

 

CN1 – Pin 4 to Pin 1

0 VAC

Power to Blower Motor

Standby

Volts

 

CN1 – Pin 5 to Pin 1

120 VAC

 

Ready

Volts

 

CN1 – Pin 5 to Pin 1

0 VAC

 

Cook

Volts

 

CN1 – Pin 5 to Pin 1

0 VAC

Secondary Interlock

Door Closed

Ohms

 

CN1 – Pin 8 to Pin 9

Continuity

Switch

Door Opened ....

Ohms

 

CN1 – Pin 8 to Pin 9

Infinite

 

 

 

 

 

 

Power to Relay 3

Standby

Volts

 

Relay 3 – Pin 1 to Pin 2

120 VAC

 

Ready

Volts

 

Relay 3 – Pin 1 to Pin 2

120 VAC

 

Cook

Volts

 

Relay 3 – Pin 1 to Pin 2

0 VAC

©2004 Maytag Services

16023293 Rev. 0

23

Page 23
Image 23
Maytag RFS, RCS Testing Procedures, Tab Tab, Function, Test Set-Up, Meter, Probe Placement, Results, Condition, Setting