Step 2: Built-In Mounting Assembly

IMPORTANT: Since the mounting is attached directly to the grill, you must first partially assemble your grill by attaching the control panel to the grill head (refer to the appropriate grill section for assembly instructions).

Then the built-in mounting heat shield must be at- tached to the bottom of the grill head using four ¼-20 x ¾" bolts, see fig. 14 “Complete View” illustration.

Do not forget to remove the protective film from all stainless steel parts of your built-in mount.

To assemble the built-in frame (Fig. 17)

1.Align the holes of the right hand “L” bracket with the face panel (the face panel’s 12 vent slots should be on the top) and insert two 1/4 x ¾" Hex bolts and fasten with flat washer, lock washer and nut, do not tighten at this time. When properly connected the grill support tabs on the “L” bracket should be facing up and inward.

2.Repeat procedure to connect the left hand “L” bracket.

3.Attach the rear bracket to both the right and left “L” brackets using two ¼ - 20 x ¾" Hex bolts at each end. Secure bolts with a flat washer, lock washer and nut.

4.Attach the frame to the bottom grill head by aligning the frame support tabs with the grill head bottom holes. Insert the ¼ - 20 x 1 ¼" Hex bolt from inside the grill head and screw it into the threaded frame support tab.

To connect the full assembly to the enclosure.

5.Slide the grill head into the opening 3/4 of the way in. Connect the gas supply using an approved out- door connector. Check for gas leaks. (See Gas Leaks page 23.)

Mountings

Note: Be certain that the gas pressure is between 6.5" and 7.5" water column. Excess gas pressure can cause warping and damage to grill head.

6.When finished connecting gas supply, slide grill all the way into to opening so that the “L” bracket face flanges fit snuggly to your enclosure face. Drill a hole in the masonry to match up with the “L” bracket face flange holes and fasten with lag bolts (not supplied).

Do not build a shelf below the bottom of the grill. The grill requires an open area for proper ventilation and service access.

7.Install the pre-assembled door kit by securing with a suitable fastening method. (Anchors and/or screws not included.)

When you complete the mount assembly go to the appropriate Grill Assembly Section and fin- ish assembling the grill head.

13

Page 13
Image 13
MHP TJK, WNK Built-In Mounting Assembly, To assemble the built-in frame Fig, To connect the full assembly to the enclosure