Miele KFN 9755 IDE installation instructions Plumbing, Connecting the water supply

Models: KFN 9755 IDE

1 60
Download 60 pages 31.11 Kb
Page 39
Image 39
Plumbing

Plumbing

All plumbing work should be carried out by a suitably qualified and competent person, in accordance with all applicable local and national regulations.

The manufacturer is not liable for damage to property due to an incorrect installation or water connection.

The water quality must conform to country requirements for drinking water.

The appliance is only suitable for connection to the cold water supply.

Water pressure on-site: Minimum: 14.5 psi

Maximum: 145 psi, if higher, install a pressure reduction valve.

A separate shut-off valve must be installed, so that the water supply can be interrupted as needed. If one is not present, have a water valve installed by a licensed plumber.

It must be easily accessible after the appliance has been built-in.

Suitable 1/4" tubing or copper piping must be supplied for plumbing.

To ensure the best ice cube quality, the maximum length of the tubing or copper pipe should not exceed 4 ft. 11" (1.5 m). If too much water remains in the tubing the quality could be affected.

Connecting the water supply

Before any installation or maintenance work is performed be sure the appliance is disconnected from the electrical supply.

Connection to the water supply should include a shut-off valve with a 3/4" thread.

^Remove the cover cap a from the solenoid valve b.

^Install the compression fitting c with the sealing ring d on the solenoid valve b.

^Attach the copper line e to the compression fitting c.

^Secure the copper line to the appliance using cable clips f.

39

Page 39
Image 39
Miele KFN 9755 IDE installation instructions Plumbing, Connecting the water supply