Miele KFN 9755 IDE Plumbing, Slide the appliance into the installation niche

Models: KFN 9755 IDE

1 60
Download 60 pages 31.11 Kb
Page 40
Image 40
^Slide the appliance into the installation niche.

Plumbing

^Open the water supply slowly and check the water system for leaks.

^The appliance can now be connected to the electrical supply (see "Electrical connection").

Before using the appliance for the first time the water pipe should be purged of air by a qualified person.

^Slide the appliance into the installation niche.

Be sure not to kink the hose, otherwise there is the risk of leaks and water damage.

After a maximum of 24 hours the first ice cubes will drop out of the ice cube maker and collect in the drawer.

40

Page 40
Image 40
Miele KFN 9755 IDE installation instructions Plumbing, Slide the appliance into the installation niche