SECTION 4 − INSTALLATION

4-1. Installing Welding Generator

Movement

YDo Not Lift Unit From End

OR

Airflow Clearance

18in

(460 mm)

 

18 in

18 in

(460 mm)

 

(460 mm)

 

18 in

18 in

(460 mm)

(460 mm)

 

Location

OR

Grounding

 

1

Generator Base

 

 

2

Metal Vehicle Frame

1

3

3

Equipment Grounding

4

Terminal

 

 

 

 

GND/PE

 

OR

 

 

Electrically bond generator frame to

 

vehicle frame by

metal-to-metal

2

contact.

2

4 Grounding Cable

Use #10 AWG or larger insulated copper wire.

YIf unit does not have GFCI receptacles, use GFCI- protected extension cord.

install1 3/96 − Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854

4-2. Installing Exhaust Pipe

Y Stop engine and let cool.

Y Do not blow exhaust toward air cleaner or air intake.

Top View

Tools Needed: 1/2 in

exh_pipe2 4/96 − ST-154 089-A / ST-154 611 / ST-180 933-B

OM-129 647 Page 14

Page 18
Image 18
Miller Electric OM-129 Installation, Installing Welding Generator, Do Not Lift Unit From End Airflow Clearance, Location