Mitsubishi Electronics MXZ-32SV service manual Cool DRY Heat

Models: MXZ-32SV

1 44
Download 44 pages 62.89 Kb
Page 21
Image 21

<Correction>

COOL

DRY

HEAT

1Suction super heat

(MIN gas pipe temperature thermistor - Evaporation temperature thermistor)

2 Each correction w 1

-

 

 

 

(Each gas pipe temperature thermistor - Evaporation temperature thermistor)

(Main pipe temperature thermistor - sub pipe temperature thermistor)

3 Discharge temperature

w 2 w 2

w1 Perform this, when number of operation units is 2units or more

w2 When the correction opening of suction super heat is 0, correct the LEV opening by dischaege temperature.

(1)LEV opening correction by suction super heat (COOL, DRY)

(Suction super heat) = (Minimum gas pipe temperature) - (Evaporation temperature) When COOL and DRY , correct the LEV openings corrected from the table below

(2) Separate correction (COOL,DRY)

(When number of operation unit is 2 units or more)

(a)Correction by the separate super heat

Correct the LEV separately by temperature difference between each gas pipe temperature thermistor and evaporator temperature thermistor.

1Calculate each super heat of the unit from the expression below;

(Super heat) = (Gas pipe temperature thermistor) - (Evaporation temperature thermistor)

2Select a minimum super heat from among them.

3Correct an each LEV is corrected opening is corrected by difference between each super heat and minimum super heat.

21

Page 21
Image 21
Mitsubishi Electronics MXZ-32SV service manual Cool DRY Heat