CDVX Series Direct Vent Gas Fireplace
Zero Clearance Sleeve | Screws | |
(if required) | ||
| ||
| 7TDVSNORK | |
Firestop | (Snorkel) | |
| ||
7” Pipe | 4” (102mm) | |
Clearance | ||
| ||
| Min. |
24” (610mm) | Window | |
Well | ||
Minimum* |
| |
| Gravel | |
| Drain | |
| Foundation Wall | |
| *A minimum of 24” (610mm) ver- | |
| tical pipe must be installed when | |
| using the 7TDVSNORK Kit. | |
| *The 22” (559mm) vertical rise | |
| (center to center) of the snorkel | |
| may be included for calculationof | |
| max. horizontal run. | |
BG402 |
| |
Fig. 53 Below grade installation. | ||
| Snorkel | |
Foundation Recess | Wall Screws | |
| ||
Recess Brackets |
| |
Watertight Seal | Sheet Metal | |
Around Pipe | ||
Screws | ||
| ||
| BG401 |
Fig. 54 Snorkel installation, recessed foundation.
Vertical
This Gas Fireplace has been approved for:
•Vertical installations up to 40’ (12 m) in height. Up to a 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of two 90° elbows. (Fig. 55)
•Up to two 45° elbows may be used within the horizontal run. For each 45° elbow used on the horizontal level the maximum horizontal length must be reduced by 18” (457 mm).
Example: Maximum horizontal length 0 x 45° elbows = 10’ (3 m)
1 x 45° elbows = 8¹⁄₂’ (2.6 m)
2 x 45° elbows = 7’ (2.1 m)
•A minimum of an 8’ (2.4 m) vertical rise.
Max. 10' (3m) |
Max. Height |
40' (12m) |
Min. Height |
756O' (2.3m) |
Pipe Straps Every |
3’ (914mm) |
FP1244 |
Fig. 55 Support straps for horizontal runs. |
•Two sets of 45° elbows offsets within these vertical installations. From 0 to a maximum of 8’ (2.m) of vent pipe can be used between elbows. (Fig. 56)
•7DVCS must be used to support offsets. (Fig. 58) This application will require that you first determine the roof pitch and use the appropriate starter kit. (Refer to Venting Components List)
•The minimum height of the vent above the highest point of penetration through the roof is 2’ (610 mm). (Fig. 60)
Vertical
1.Locate your fireplace.
2.Plumb to center of the (4” (102 mm) flue collar from ceiling above and mark position.
3.Cut opening equal to 9³⁄₈” x 9³⁄₈” (240 x 240 mm).10³⁄₈” x 9³⁄₈” (264 x 240 mm) when using 7TCRVT1320.
4.Proceed to plumb for additional openings through the roof. In all cases, the opening must provide a minimum of 1” (25 mm) clearance to the vent pipe, i.e., the hole must be at least 9³⁄₈” x 9³⁄₈” (240 x 240 mm).
5.Place fireplace into position.
6.Place firestop(s) #7DVFS or Attic Insulation Shield #7DVAIS into position and secure. (Fig. 57)
7.Install roof support (Fig. 58) and roof flashing making sure upper flange of flashing is below the shingles. (Fig. 59)
26 | 20012253 |