Monessen Hearth 36CDVXTRN Vertical Through-the-RoofApplications, 20012253

Models: 36CDVXTRN

1 44
Download 44 pages 17.07 Kb
Page 20
Image 20
Vertical Through-the-Roof Applications

CDVX Series Direct Vent Gas Fireplace

Do not back fill around snorkel. A clearance of at least 4” (102 mm) must be maintained between the snorkel and the soil.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 35)

 

Snorkel

Foundation Recess

Wall Screws

 

Recess Brackets

 

Watertight Seal

Sheet Metal

Around Pipe

Screws

 

BG401

Fig. 35 Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

1.Vertical installations up to 40’ (12 m) in height. Up to 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of three 90° elbows.

2.Up to two 45° elbows may be used within the horizontal run. For each 45° elbow used on the horizontal level the maximum horizontal length must be reduced by 18” (457 mm).

Maximum

Example: Maximum horizontal length

0 x 45° elbows

=

10’ (3 m)

1 x 45° elbows

=

8¹⁄’ (2.6 m)

2 x 45° elbows

=

7’ (2.1 m)

3.A minimum of an 8’ vertical rise.

4.Two sets of 45° elbows offsets within these vertical installations. From 0 to a maximum of 8’ (2.4 m) of vent pipe can be used between elbows. (Fig. 37)

5.7DVCS must be used to support offsets. (Fig. 36) This application will require that you first determine the roof pitch and use the appropriate 7DVSKV (A, B or F). (Refer to Venting Components List, Page 27)

 

 

Max.

 

 

 

8’

 

 

 

(2.4 m)

 

 

45°

 

Typical

 

 

50’

Ceiling

 

 

Support

 

Max.

(15 m)

 

 

Application

 

8’

 

 

(2.4 m)

 

 

 

 

45°

 

 

 

 

Typical Roof

 

 

 

Support Ap-

 

 

 

plication

Typical Offset Installation

FP1021

Fig. 37

Typical vertical roof applications.

 

Minimum

10’ (3 m)

Vertical Through-the-Roof Installation

8’ (2.4 m) / Maximum

40’ (12 m) Vertical Rise

Vertical Through-the-Roof Installation Pipe Straps Every 3’ (914 mm)

CFM148

Fig. 36 Support straps for horizontal runs.

1.

Locate your fireplace.

2.

Plumb to center of the (4”) flue collar from ceiling

 

above and mark position.

3.

Cut opening equal to 9³⁄” x 9³⁄” (240 x 240

 

mm). 10³⁄” x 9³⁄” (264 x 240 mm) when using

 

7TCRVT1320.

4.

Proceed to plumb for additional openings through

 

the roof. In all cases, the opening must provide a

 

minimum of 1 inch clearance to the vent pipe, i.e.,

 

the hole must be at least 9³⁄” x 9³⁄” (240 x 240 mm).

5.

Place fireplace into position.

6.

Place firestop(s) #7DVFS or Attic Insulation Shield

 

#7DVAIS into position and secure. (Fig. 38)

20

20012253

Page 20
Image 20
Monessen Hearth 36CDVXTRN Vertical Through-the-RoofApplications, Vertical Through-the-RoofInstallation, 20012253