Motorola BT100 operation manual Completing the Test Procedures

Models: BT100

1 52
Download 52 pages 62.92 Kb
Page 43
Image 43

4-4

Bench Testing

Example:

11.2dB (measured gain)

+1.0 dB (equalizer insertion loss)

+1.1 dB (power combiner)

+0.0 dB (pads)

+4.6 dB (cable simulator at 40 MHz)

17.9dB (unit gain)

Completing the Test Procedures

The amplifier is now approximately tailored for a specific field location. Additional adjustments after installation are minor in nature. Re-install the fuses removed during testing.

Complete station records by recording pertinent information. Remove test-equipment connections and close the housing following instructions provided in Section 5, “Installation,” Closing the Housing.

BT100 Installation and Operation Manual

Page 43
Image 43
Motorola BT100 operation manual Completing the Test Procedures