Moyer Diebel MH-6NM3, MH-6LM3, MH-60M3 technical manual Initial Start-Up, Complete the installation

Models: MH-60M3 MH-6LM3 MH-6NM3

1 72
Download 72 pages 55.49 Kb
Page 18
Image 18
INITIAL START-UP

INITIAL START-UP

INITIAL START-UP

Complete the installation

After plumbing and electrical connections are made, follow the steps below to complete the installation of your dishwasher.

1.Remove the white protective covering from the exterior of the machine.

2.Remove any foreign material from inside the machine.

3.Make sure dishwasher power switch is off.

4.Turn main water supply on.

5.Turn main power on at the main power service disconnect switch.

1

Install the Scrap Screens and Drain-Overflow Assembly

Install scrap screens. Make sure rubber stopper is secure on the drain- overflow assembly.

Make sure the drain-overflow seats securely in the

tank bottom.

MAKE SURE DOORS

ARE FULLY CLOSED.

2

The controls are located

A

on the front of the dishwasher.

 

A-

On/Off power switch

 

B-

Power indicator Light

 

C-

In-cycle light

 

D-

Extended wash switch

 

E-

Wash water

 

 

temperature gauge

 

F-

Final rinse

E

 

pressure gauge

POWER

B

EXTENDED WASH

 

CYCLE

 

D

OFF

 

WASH

C RINSE PRESSURE

F

16

Page 18
Image 18
Moyer Diebel MH-6NM3, MH-6LM3, MH-60M3 Initial Start-Up, Complete the installation, Make Sure Doors Are Fully Closed