Table of Contents

 

Furnace Specifications

4-5

Furnace Airflow Data

6-7

Installation Requirements

8

Supply Air Plenum Installation

9

Installation on a Concrete Slab

9

Installation on a Combustible Floor

9

Circulating Air Supply

10

Return Air

11

Venting and Combustion Air Requirements

11

Air Requirements for One-Pipe Installation

13

Installation in An Unconfined Space

13

Installation in A Confined Space

13

• Air From Inside

13

• Air Directly Through An Exterior Wall

14

• Outdoor Air Through Vertical Openings or Ducts

14

• Outdoor Air Through Horizontal Openings or Ducts

14

Venting Requirements

14

Vent Pipe Material

14

Vent Pipe Length and Diameter

14

Vent Pipe Installation

15

Pipe Routing & Support

15

Location of Outdoor Terminations

18

Horizontal Venting

19

Vertical Venting

20

Vent Freezing Protection

20

Concentric Vent Termination

20

Drainage of Condensate From Furnace

21

Gas Supply and Piping

22

Leak Check

22

Conversion

23

High Altitude Application

23

Natural Gas High Altitude Conversion

23

LP/Propane Gas Sea Level and High Altitude Conversion

23

Electrical Wiring

24

Line Voltage Wiring

24

Low Voltage Wiring

25

Start-up and Adjustments

25

Start-Up Procedure

26

Verifying and Adjusting Firing Rate

26

Verifying and Adjusting Temperature Rise

27

Verifying Burner Operation

27

Verifying Operation of the Supply Air Limit Switch

29

Description of Components

29

Maintenance

31

Combustion Air and Vent System

31

Air Filter(s)

31

Lubrication

31

Condensate Drain Assembly

31

Blower Compartment

31

Heat Exchanger and Burner Maintenance

31

Location of Major Components

32

System Operation Information

31

Sequence of Operation

33

Furnace Fails to Operate

34

Twinning of Two Furnaces

34

Installation/Performance Checklist

35

Page 3
Image 3
Nordyne G6RL 90+, G6RC 90+, G6RD 93+ installation instructions Table of Contents