Nortel Networks FastRad manual Package check list, Environment check list

Models: FastRad

1 35
Download 35 pages 62.56 Kb
Page 13
Image 13

3

Before you start

Make sure you read and follow the instructions in this guide.

Make sure you have the necessary tools to complete the installation. A Special parts check list is provided in this guide.

Make sure all equipment in the FastRAD package is accounted for. A Package check list is provided in this guide.

Make sure the necessary environment and electrical con- ditions are met. An Environment check list and list of Electrical requirements are provided in this guide.

Important: Only one FastRAD can be connected to a KSU.

Environment check list

The FastRAD installation area should be:

clean, free of dust, dry and well ventilated

between 0° and 50° Celsius (32° to 122° Fahrenheit)

non-condensing relative humidity between 5% and 95%

within 800 m (2600 feet) of the Norstar KSU

Note: When using a Norstar 3X8 KSU the FastRAD must be installed within 305 m (1000 feet).

free of Bridge taps on the FastRAD KSU TCM loop

free of Loading coils on the FastRAD KSU TCM loop

Package check list

Make sure the package contains:

the Norstar FastRAD

an RJ-11 teladapt cord

a power supply with a barrel connector

a paper template (for mounting)

FastRAD Installation Guide

Page 13
Image 13
Nortel Networks FastRad manual Package check list, Environment check list