
4.Place the alignment rod in the hole on the sensor flange. Align the flange so rod is parallel to the process pipe.
sensor flange
alignment rod
direction of flow | process pipe (top view)  | 
The flow sensor alignment rod MUST be parallel to the process pipe as shown.
5.Thread upper hex nuts with 
sensor flange
FLOW
 cap nuts
 upper hex nuts and 
jam nuts ![]()
5.95 in.
(151 mm)
brass sensor nut ![]()
![]()
 ISO 
female pipe fitting
lower  | 
hex nuts  | 
"H"  | 
wall  | 
thickness  | 
10% of I.D.
pipe I.D.
FLOW
process pipe
9