TORQUE REQUIREMENTS

CONNECTION

TORQUE IN POUND MEASURES

 

 

AC and PV breakers

to 22 inch-lbs = 2.48 Nm

 

 

DC shunt

to 15 foot-lbs = 20.4 Nm

 

 

DC battery connections

to 10 foot-lbs = 13.6 Nm

 

 

FX’s DC Terminals

to 10 foot-lbs = 13.6 Nm

 

 

FX’s AC Terminals

to 30 inch-lbs = 3.38 Nm

 

 

Table 1 Torque Values for Installation

12

Page 15
Image 15
Outback Power Systems FX 2024 T installation manual Torque Requirements, Connection Torque in Pound Measures