11 3/8 X 1-3/4” | 3/8 X 3-3/4” 6 | | |
| | | D |
| | | R |
| | | 35 |
| 19 | | 24 |
| | E |
| | |
| AB | | |
| | S | |
| | | 34 |
| | 4-1/2” PULLEY 36 | 19 |
| | |
| AM | | |
| | | AM |
| | | AF |
| | | FIGURE 17 |
STEP 17:
•Route the LAT CABLE (AM) around one 4-1/2” PULLEY (36) and assemble the PULLEY to the LEFT (D) and RIGHT (E) BOOM PLATES using one 3/8 X 3-3/4” BOLT (6), one LONG “L” CABLE BRACE (S), one 1” SPACER (24) and one 3/8” LOCK NUT (19). See FIGURE 17.
•SECURELY assemble two PLASTIC SLEEVES (34) to the LEFT (D) and RIGHT (E) BOOM PLATES using two 3/8 X 3-3/4” BOLTS (6) and two 3/8” LOCK NUTS (19) as shown in FIGURE17.
•Route the LAT CABLE (AM) around one 3-1/2” PULLEY(35) and assemble two FLOATING PULLEYPLATES (AB) to the 3-1/2” PULLEY (35) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 17. (NOTE: Make sure the cable runs in the grooves of the pulleys.)
•Route the LAT CABLE (AM) over two 3-1/2” PULLEYS (35) and assemble the PULLEYS to the LEFT (D) and RIGHT (E) BOOM PLATES using two 3/8 X 3-3/4” BOLTS (6), two SHORT “L” CABLE BRACES (R), two 15/16” SPACERS (24) and two3/8” LOCK NUTS (19). See FIGURE 17.
•Screw the threaded end of the LAT CABLE (AM) into the end of the HEAD PLATE ASSEMBLY (AF) .See FIGURE 17.
18