| 3/8 X 3-3/4” 6 | | |
| | A | |
| | 26 | |
| X | | 35 |
| | |
| 18 | | 19 |
| | |
| 25 | | |
| | 19 | AM |
| | |
| 35 | 3/8 X 1-3/4” 11 | |
| | |
3 | 3/8 X 8” | AA | 35 |
| 19 |
| | |
FIGURE 16 | | |
STEP 16:
•Route the LAT CABLE (AM) through the PRESS ARM SUPPORT FRAME (X) and assemble one 3-1/2” PULLEY (35) to the FRAME PRESS ARM SUPPORT FRAME (X) using one 3/8 X 8” BOLT (3), two 3/8” WASHERS (18), two 3/8 X 1-1/4” SPACERS (25) and one 3/8” LOCK NUT (19). See FIGURE 16.
•Route the LAT CABLE (AM) through the FRAME (A) and assemble one 3-1/2” PULLEY (35) to the FRAME (A) using one
3/8 X 3-3/4” BOLT (6), two 3/8 X 1-1/16” FLANGE SPACERS (26) and one 3/8” LOCK NUT (19). See FIGURE 16.
•Route the LAT CABLE (AM) around one 3-1/2” PULLEY (35) and assemble the PULLEY to the DOUBLE FLOATING PULLEY BRACKET (AA) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 16. (NOTE: Make sure the cable runs in the grooves of the pulleys.)
| 1/2 | | 1/2 | | 1/2 | | 1/2 | | 1/2 | | | 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
17