11 3/8 X 1-3/4”

 

 

 

AB

JAM NUT

 

35

 

 

 

19

AO

 

 

 

 

Z

 

 

23

3/8 X 3-3/4” 6

 

 

 

 

A

18

19

FIGURE 19

STEP 19:

Screw the threaded end of the GUIDE CABLE (AO) into the end of the FLOATING PULLEY BRACKET (Z). Secure the CABLE GUIDE (23) in place with the JAM NUT on the GUIDE CABLE. See FIGURE 19.

Route the GUIDE CABLE (AO) around one 3-1/2” PULLEY (35) and assemble the PULLEY to the FLOATING PULLEY PLATES (AB) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 19. (NOTE: Make sure the cable runs in the grooves of the pulleys.)

Route the hook end of the GUIDE CABLE (AO) thru the CABLE GUIDE (23) then SECURELY assemble the hook end of the GUIDE CABLE (AO) to the BASE using one 3/8 X 3-3/4” BOLT (6), one 3/8” WASHER (18)and one 3/8” LOCK NUT (19) as shown in FIGURE 19.

20

Page 20
Image 20
ParaBody GS4 manual Jam Nut