PREPARING PADDLE ASSEMBLY

Take the adjustable paddle assembly and turn it up side down to show the bottom of the base.

2 Sets of 4 Matching Holes

Screws

 

Cable

 

Passage

Adjustable

Paddle

Cover

Now, unscrew the 2 screws on the

cable passage cover and take the cable

Lock/Release passage cover away to show the cable Lever

passage.

If there is no need to install the optional UPS battery here (either not to be installed or already installed), please skip the next paragraph and directly start routing cables through the cable passage. Otherwise, please remove the four screws holding battery cover to install the battery.

Four Screws

Holding

Battery Cover

Cable Passage

Battery Cover

Cable Passage

Cover

TP6000 USER’S MANUAL 4 - 2

Page 18
Image 18
POSIFLEX Business Machines TP-6000 SERIES user manual Preparing Paddle Assembly