iii) Termination to a drain or gully
Boiler
Pipe must terminate above water level but below surrounding surface. Cut end at 45°
50mm | per |
| |
|
| ||
|
| metre |
|
2. | of pipe | run | |
| |||
| 5° | Minimum |
|
|
| fall |
|
7.0Site Requirement
7.7Condensate Drain (cont.)
11.When discharging condensate into a soil stack or waste pipe the effects of existing plumbing must be considered. If soil pipes or waste pipes are subjected to internal pressure fluctuations when WC's are flushed or sinks emptied then
Boiler
iv)Termination to a purpose made soakaway Further specific requirements for soakaway design are referred to in BS 6798.
500mm min
50mm per | ||
| metre of | |
2.5° | pipe run | |
Minimum fall | ||
|
Holes in the
18© Baxi Heating UK Ltd 2012