Manuals
/
Potthof & Co
/
Household Appliance
/
Boiler
Potthof & Co
33kw, 24kw, 28kw manual 19.0Pages for Notes, Baxi Heating UK Ltd
Models:
24kw
28kw
33kw
1
61
64
64
Download
64 pages
28.28 Kb
57
58
59
60
61
62
63
64
<
>
Install
Parts list
Error messages
16.1Illustrated Wiring Diagram
Plume Displacement
Dimension
14.21Diverter Valve - Motor Unit & Assembly Fig
Fault Finding
11.3Setting the Timer
15.0Setting the Gas Valve
Page 61
Image 61
19.0
Pages for Notes
© Baxi Heating UK Ltd 2012
61
Page 60
Page 62
Page 61
Image 61
Page 60
Page 62
Contents
Gold HE A
Installation & Service Instructions
Range
Condensing
Natural Gas
0086
ISO FM
Scheme Members only
Installer Notification Guidelines
Legislation
General
Safe Manual Handling
Preparation
Technique
CONTENTS
1.2Contents of Pack
1.0Introduction
1.1Description
Layout
General Layout
3.1Central Heating Mode Fig.
3.0Appliance Operation
3.2Domestic Hot Water Mode Fig.
3.3Frost Protection Mode
4.1Gold Combi 24, 28 & 33 HE A
4.0Technical Data
Pump - Available Head
Dimensions
5.0 Dimensions and Fixings
780mm
At least
6.1Information
6.0System Details
6.2Central Heating Circuit
6.3Bypass
6.0System Details
6.7Safety Pressure Relief Valve Fig.
6.5System Filling and Pressurising Fig.
6.6Expansion Vessel Central Heating only
6.8Domestic Hot Water Circuit Fig.
6.0System Details
Showers
6.10Hard Water Areas
7.1Location
7.0 Site Requirements
7.2 Clearances Figs. 8 &
7.3Ventilation of Compartments
7.0Site Requirement
7.4Gas Supply
7.5Electrical Supply
of pipe run
7.0Site Requirements
Minimum
fall
metre
7.0Site Requirement
Minimum
fall
metre
7.0 Site Requirement
metre
metre
7.8Flue
7.0Site Requirements
R N M I F B L A G I
Total equivalent length = A+B+C+2x90Bends
8.0Flue Options
8.1Horizontal Flue Systems
Horizontal Flues
Total Equivalent Length =
Flue Options
A+B+C+1x90Bend
Vertical Flues
8.0Flue Options
8.3Flue Accessories
8.4Twin Flue Duct Adaptor
8.0Flue Options
8.5Twin Flue Connection
8.0Flue Options
8.7Flue Dimensions
8.6For Roof Terminals
8.8Flue Trim
9.1 Plume Displacement Kit Fig.
9.0 Plume Displacement
28/33
9.0Plume Displacement
28/33
28/33
50mm
Plume Displacement
General Fitting Notes
30mm
Plume Displacement
30mm
10.1Unpacking & Initial Preparation
10.0Installation
10.2Flushing
10.3
10.0 Installation
Fitting the Filling Loop Kit
10.4Fitting The Boiler
10.0Installation
10.6Condensate Drain see section
10.7Fitting The Flue
10.0Installation
10.7Fitting the Flue Cont
10.0 Installation
10.8Making The Electrical Connections
10.0Installation
10.9Preliminary Electrical Checks
11.1Commissioning the Boiler
11.0Commissioning
11.0Commissioning
11.0Commissioning
11.3Setting the Timer
12.1Completion
12.0Completion
13 .1 Annual Servicing
13.0 Servicing
13.2
Annual Servicing - Inspection
Electrode Position
13.0 Servicing
10 ±1
Annual Servicing - Inspection Cont
14.1Igniter Fig.
14.0 Changing Components
14.2Spark and Sensing Electrodes Fig.
14.3Fan Fig.
14.0Changing Components
14.4Venturi Fig.
14.5Injector Fig.
14.6Burner Fig.
14.0 Changing Components
14.7Insulation Fig.
14.11Safety Thermostat Fig.
14.10Central Heating Temperature Sensor NTC Fig.
14.12DHW Temperature Sensor NTC Fig.
14.0Changing Components
14.14Pump - Head Only Fig.
14.0Changing Components
14.15Pump - Complete Fig.
14.16Automatic Air Vent Fig.
14.17Pressure Gauge Figs. 94 &
14.0Changing Components
14.18Hall Effect Sensor Fig.
14.19Pressure Relief Valve Fig.
14.0Changing Components
14.21Diverter Valve - Motor Unit & Assembly Fig.
14.20Plate Heat Exchanger Fig.
14.0Changing Components
14.23 Selector Switch Fig.
14.22P.C.B. Fig.
14.24Gas Valve Fig.
14.0Changing Components
14.25Expansion Vessel Fig.
15.1Setting the Gas Valve CO2 check
15.0Setting the Gas Valve
16.1Illustrated Wiring Diagram
16.0Electrical
Control PCB
brown
Short Parts List
17.0 Short Parts List
315316 311 404419 422 400 415
503 504
18.1Initial Fault Finding Checks
18.0Fault Finding
18.2Error Codes
18.0 Fault Finding
Turn Domestic Hot Water
18.0 Fault Finding
Fault Finding Solutions Sections
Electrode Position
18.0 Fault Finding
10 ±1
18.0 Fault Finding
60 Baxi Heating UK Ltd
19.0Pages for Notes
Baxi Heating UK Ltd
19.0Pages for Notes
CENTRAL HEATING MODE Measure and Record
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
DOMESTIC HOT WATER MODE Measure and Record
ALL INSTALLATIONS
Service Record
Brooks House, Coventry Road, Warwick. CV34 4LL
POTTERTON
e&oe
7202085 - 07 5/12