S3.19 Assembly and Maintenance Guide

8. Install Leg Extension Cable

A.Remove the hex head bolt from the Gusset which is welded to the Base Frame. Place the end of the Leg Extension Cable 130210 on the bolt as shown. Secure the cable end by reinserting the fasteners: one 2¼-inch hex head bolt

one locknut Wrench tighten.

B.Disassemble the 3½-inch pulley at the base of the Multiplier Arm. Wrap the cable around the pulley and secure it using

one 2¼-inch zinc hex head bolt 1 cable guard

two zinc flat washers one zinc locknut Wrench tighten.

C.Feed the cable through the Main Base and beneath the 3½-inch pulley located inside the Gusset.

D.Attach the threaded end of the cable to a Single Floating Pulley. Continue turning the screw three to four full turns to secure it inside the floating pulley housing. Rest the Single Floating Pulley on the floor.

 

Multiplier Arm

 

 

 

 

 

 

C

 

 

 

 

 

Leg Extension

 

 

 

 

 

Cable 130210

 

 

 

 

 

Gusset

 

 

1 - 2¼"zinc bolt

B

 

 

 

 

1 - cable guard

 

 

 

 

2 - zinc washers

 

 

 

 

 

1 - zinc locknut

 

 

 

 

 

Single Floating

 

 

 

 

Pulley

1 - 2" bolt

D

 

1 - 2¼" bolt

 

 

2 - washers

A 1 - locknut

 

 

1 - locknut

 

 

 

 

1

2

3

4

5

6

Step 8. Install Leg Extension Cable

page 21

Page 21
Image 21
Precor S3-19 manual Install Leg Extension Cable