S3.19 Assembly and Maintenance Guide

E. Feed the cable over the lower 3½-inch pulley

located in the Press Arm assembly. Attach the

pulley to the Press Arm assembly using

one 2-inch zinc hex head bolt

two zinc flat washers

one zinc locknut

Lat Bar Holder

1 - 2" zinc bolt

2 - 2" bolts J 4 - washers 2 - locknuts

F.

Feed the cable over the upper 3½-inch pulley

 

located in the Main Upright. Attach the pulley to the

 

Main Upright using

 

one 4-inch hex head bolt

 

two 1¼-inch shoulder spacers

 

one locknut

G.

Pull the slack out of the Lat Pulley Cable so the ball

 

end of the cable rests against the Lat Bar Holder.

H.

Feed the threaded end of the cable between the

 

two 3½-inch pulleys inside the Double Floating

 

Pulley.

J.Let the Double Floating Pulley hang as you continue to feed the cable through the hole in the Upper Frame Crosspiece and over the two 3½-inch pulleys attached to the Top Beam assembly. Reattach the pulleys to the assembly using

two 2-inch hex head bolts four flat washers

two locknuts

K.Feed the cable down through the hole in the Upper Frame Crosspiece and attach the threaded end of the cable into the Selector Stem. Continue turning the screw three to four full turns to secure the threads inside the Selector Stem.

L.Wrench tighten all pulley fasteners.

Important: Do not tighten the Double Floating Pulley fasteners or the jam nut on the threaded end of the cable, at this time.

2 - zinc washers E

1 - zinc locknut

1 - 4" bolt

2 - shoulder spacers F

1 - locknut

H

Pull slack and place the

Gexcess cable on the floor while you assemble the Double Floating Pulley.

K

1

2

3

4

5

6

Step 7. Install Lat Pulley Cable, continued

page 20

Page 20
Image 20
Precor S3-19 manual Feed the cable over the lower 3½-inch pulley