EST150

Step 6

1)Tighten the mounting screws which secures the mounting legs to the projector.

Do not overtighten the mounting screws.

Step 7

1) Insert one (1) Barrel Cap (except for the security barrel) into the end of each leveling barrel.

Go to the “Attaching the Mount Carriage to the

Projector Arm” section on page 15.

Single Mounting Point Installation

A single ¼-20 x 5/16screw must be used to attach the mount carriage to the projector if your projector has only one mounting point.

Do not overtighten the ¼-20 x 5/16screw.

Proceed to the “Attaching the Mount Carriage to the

Projector Arm” section on page 15.

Page 12

Visit the Premier Mounts website at http://www.premiermounts.com

Installation Instructions

Page 12
Image 12
Premier Mounts EST150 Single Mounting Point Installation, Go to the Attaching the Mount Carriage to