Quadra-Fire DV-40 manual Horizontal Installation Cont

Models: DV-40

1 51
Download 51 pages 52.92 Kb
Page 21
Image 21
FIG. 9

HORIZONTAL INSTALLATION (CONT.)

Step 5. Before connecting the horizontal run of vent pipe to the vent termination, slide the black decorative wall thimble cover over the vent pipe.

Step 6. Slide the stove and vent assembly towards the wall, carefully inserting the vent pipe into the vent cap assembly. It is important that the vent pipe extend into the vent cap sufficient distance so as to result in a minimum pipe overlap of 1¼” (32mm). Secure the connection between the vent pipe and the vent cap by attaching the two sheet metal strips extending from the vent cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe section. Bend any remaining portion of the sheet metal strip back towards the vent cap, so it will be concealed by the decorative wall thimble cover (Figure 9).

Note: The attachment from the vent pipe to the vent cap must be siliconed.

Step 7. Slide the decorative wall thimble up to the wall surface and attach with screws provided. (Figure 10). Apply decorative brass or chrome trim if desired.

.der iseder ised

FIG. 9

FIG. 10

Page 21

Page 21
Image 21
Quadra-Fire DV-40 manual Horizontal Installation Cont