Quadra-Fire DV-40 manual Fig. A, Fig. B, Fig. C, Conversion Instructions Cont, Log replacement

Models: DV-40

1 51
Download 51 pages 52.92 Kb
Page 34
Image 34
CONVERSION INSTRUCTIONS (CONT.)

CONVERSION INSTRUCTIONS (CONT.)

Pilot Tower Orifice Replacement

13.Loosen (CCW rotation) and remove pilot target hex fitting with a 7/16” end wrench as shown in figure A.

FIG. A

14.Remove the currently installed orifice with a pair of needlenose pliers or other means as shown in figure B.

FIG. B

15.Install the conversion orifice.

16.Reinstall the pilot target hex fitting and tighten it until the index marks align with each other as shown in figure C.

FIG. C

17.Reinstall left burner pan top plate. (Reverse steps 8 & 9)

18.Reinstall center burner pan top plate.

19.Reinstall rear burner by slipping burner end over orifice receiver and snapping into pinch brackets.

20.Reinstall “U” burner by slipping through shutter ring and over orifice receiver and snapping into pinch bracket.

21.Orifice sizes for the pilot are as follows:

NG=.026/.023LP=.026/.016

Log replacement

22.Reinstall in reverse order of steps 5-7.

23.Install nuggets and top logs as instructed on page 35-37 of this manual.

Page 34

Page 34
Image 34
Quadra-Fire DV-40 Fig. A, Fig. B, Fig. C, Conversion Instructions Cont, Pilot Tower Orifice Replacement, Log replacement