MAINTENANCE

VALVE TRAY REPLACEMENT

1)

Remove the exterior brick panels.

3) Loosen the screw that holds the right side

8) Remove the grate by undoing the 2 screws

2)

Remove the glass door.

heat shield in place.

on the right and left side.

 

 

a. Release the 2 door latches on the left and right side at the top of the fi rebox.

Latch Location

 

Grate

Heat

9) Remove the front burner by removing the

Shield

Latch

screw.

4)Lift up and pull out the heat shield slightly to clear the screwheads and then hang it on the top bracket (located directly above the heat shield).

5)Disconnect both sources of power; the power cord, located on the left hand side of the fi rebox and the wires connected to the back-up battery located on the right side of the fi rebox.

b.Swingthedooroutfromthetopandrelease the hinges on the left and right side of the door by lifting them up.

Hinge

Door

c.Place the door on a soft surface to prevent scratching.

Front Burner

Backup

Battery

Power

Receptacle

Front Burner Removed

10)Remove the back burner by removing the screw.

MAINTENANCE

6)Remove the log set.

7)Remove the interior brick panels.

Back Burner

Regency® L900E Direct Vent Gas Fireplace

39

Page 39
Image 39
Regency L900E-NG installation manual Valve Tray Replacement, Latch Screw