Manuals
/
Regency
/
Household Appliance
/
Indoor Fireplace
Regency
P121LC Installation, Specifications, Note: These units are non-loadbearing, P131-1Pier
Models:
P121LC
P121
P121RC
P131
1
6
40
40
Download
40 pages
33.79 Kb
3
4
5
6
7
8
9
10
<
>
Specification
Install
Parts list
Diagram
Log Replacement
Warranty
Dimension
Maintenance
control wires to a 120V wire
Top Standoff Assembly
Page 6
Image 6
INSTALLATION
SPECIFICATIONS
P121-1
See Thru
Note: These units are
non-load
bearing.
P131-1
Pier
6
Regency
P121-1/P121LC-1/P121RC-1/P131-1
Zero Clearance Direct Vent Gas Fireplace
Page 5
Page 7
Page 6
Image 6
Page 5
Page 7
Contents
FOR YOUR SAFETY What to do if you smell gas
Owners & Installation Manual
FOR YOUR SAFETY
P121 / P121LC / P121RC / P131
Congratulations
Installation
TABLE OF CONTENTS
Safety Label
Maintenance
SAFETY LABEL
Copy of Safety Decal for P121/P121LC/P121RC/P131
INSTALLATION CHECKLIST
INSTALLATION
GENERAL SAFETY INFORMATION
SAVE THESE INSTRUCTIONS
Note: These units are non-loadbearing
INSTALLATION
SPECIFICATIONS
P121-1See Thru
P121LC-1Left Corner Unit
INSTALLATION
Note: These units are non-loadbearing
P121RC-1Right Corner Unit
A P121-1See Thru B P131-1Pier
INSTALLATION
LOCATING YOUR GAS FIREPLACE
C P121LC-1Left Corner D P121RC-1Right Corner
COMBUSTIBLE MANTELS
INSTALLATION
CLEARANCES
Mantel Clearances
FRAMING AND FINISHING
INSTALLATION
Framing Dimensions
Note These units are non-loadbearing
Top Standoff Assembly
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
FACING & FINISHING REQUIREMENTS
VENT
INSTALLATION
Area where terminal is not permited
EXTERIOR
INSTALLATION
VENTING ARRANGEMENT - HORIZONTAL TERMINATIONS
SIMPSON DURA-VENTVENTING
INSTALLATION
Flat Wall Installation
SIMPSON DURA-VENTVENTING COMPONENTS LIST
Straight Out Horizontal Venting
INSTALLATION
VENTING ARRANGEMENTS - HORIZONTAL TERMINATIONS
Horizontal Venting with One 1 90o Elbow
Horizontal Venting with Three 3 90o Elbows
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Horizontal Venting with Two 2 90o Elbows
Straight Up Vertical Venting
INSTALLATION
VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
Vertical Venting with One 1 90o Elbow
Vertical Venting with Two 2 90o Elbows
INSTALLATION
Vertical Venting with Two 2 90o Elbows
Vertical Venting with Three 3 90o Elbows
Vertical Venting with Three 3 90o Elbows
INSTALLATION
HORIZONTAL INSTALLATIONS
Option
Diagram Diagram
INSTALLATION
Diagram
Diagram
Offset Chart
INSTALLATION
INSTALLATION PROCEDURES
for Regency AstroCapTM Direct Vent System Flex
INSTALLATION
IF IN DOUBT DO NOT DO THIS CONVERSION
Burner Orifice
PILOT ADJUSTMENT
INSTALLATION
GAS LINE INSTALLATION
GAS PIPE PRESSURE TESTING
02-79
INSTALLATION
LOG INSTALLATION
Push back side of the left end of the log up
02-82
INSTALLATION
02-80
02-80
GLASS DOOR REMOVAL
INSTALLATION
installed the same way
FINISHING TRIM
WALL SWITCH
INSTALLATION
REMOTE CONTROL
control wires to a 120V wire
INSTALLATION
WIRING DIAGRAM
SHUTDOWN PROCEDURE
OPERATING INSTRUCTIONS
LIGHTING PROCEDURE
AERATION ADJUSTMENT
OPERATING INSTRUCTIONS
MAINTENANCE INSTRUCTIONS
General Vent Maintenance
Copy of the Lighting Plate Instructions
GOLD-PLATED ACCESSORIES
MAINTENANCE
LOG REPLACEMENT
GLASSREPLACEMENT
Remove Left & Right Side Base Brick Panels
MAINTENANCE
INSTALLING VALVE
Remove the 2 Long Base Brick Panels
MAINTENANCE
FAN REPLACEMENT
Connector wires
PARTS LIST
P121-1SEE THRU MAIN ASSEMBLY
Part #
PARTS LIST
P131-1PIER MAIN ASSEMBLY
Description
Part #
PARTS LIST
P121RC-1RIGHT CORNER MAIN ASSEMBLY
Description
Part # Description
PARTS LIST
P121LC-1LEFT CORNER MAIN ASSEMBLY
Description
PARTS LIST
Description
Conditions
WARRANTY
The Warranty: Lifetime
Exclusions
thoroughly before it leaves our door